We are pleased to announce the first order for two 155T Reachstackers from CS Wind UK wind tower manufacturers based in Campbeltown, Scotland.
The CES LHD 155T Reachstackers will be used for the moving and loading of 200T 7 meter diameter tower sections at the Campbeltown site.
CES Germany have developed the Heavy Duty Reachstacker range which has capacity’s from 45T to 250T. Manufactured in CES Italy near Verona this unique range of Reachstackers will, in this case, replace the conventional heavy lift crane and SMPT Trailer system. The Reachstacker can lift and travel with the load giving a complete solution in one piece of equipment all at a fraction of the cost of using the crane and trailer system.